Long-Run Production Problem from Chapter 5 of Gilbert and Tower (2013)
Publication
, Software
Gilbert, J; Tower, E
November 9, 2012
This file contains a simple GAMS long-run production problem, as described in Chapter 5 of Gilbert and Tower (2013) Introduction to Numerical Simulation for Trade Theory and Policy, World Scientific. Programming-Language:
Duke Scholars
Publication Date
November 9, 2012
Citation
APA
Chicago
ICMJE
MLA
NLM
Gilbert, J., & Tower, E. (2012). Long-Run Production Problem from Chapter 5 of Gilbert and Tower (2013).
Gilbert, John, and Edward Tower. “Long-Run Production Problem from Chapter 5 of Gilbert and Tower (2013),” November 9, 2012.
Gilbert J, Tower E. Long-Run Production Problem from Chapter 5 of Gilbert and Tower (2013). 2012.
Gilbert, John, and Edward Tower. Long-Run Production Problem from Chapter 5 of Gilbert and Tower (2013). 9 Nov. 2012.
Gilbert J, Tower E. Long-Run Production Problem from Chapter 5 of Gilbert and Tower (2013). 2012.
Publication Date
November 9, 2012