Skip to main content
Journal cover image

Ten years of cryomagnetic W7-X test facility construction and operation

Publication ,  Journal Article
Renard, B; Dispau, G; Donati, A; Genini, L; Gournay, JF; Kuster, O; Molinié, F; Schild, T; Touzery, R; Vieillard, L; Walter, C
Published in: Cryogenics
July 1, 2011

The construction, commissioning, and operation phases of the W7-X cryomagnetic test facility in CEA Saclay lasted ten years. The large diversity of equipments called, specialties involved and problems solved attest the expertise that was required to operate the test facility and test the coils. Nearly one hundred cryogenic tests were performed on the seventy W7-X coils, at a rate always increasing, using two cryostats each holding two coils. This paper presents the test facility and its operation first, the cryogenic difficulties that were confronted with their solutions, the electro-magnetic difficulties encountered along with corrective actions, and finally the instrumentation and data acquisition aspects. © 2011 Elsevier Ltd. All rights reserved.

Duke Scholars

Altmetric Attention Stats
Dimensions Citation Stats

Published In

Cryogenics

DOI

ISSN

0011-2275

Publication Date

July 1, 2011

Volume

51

Issue

7

Start / End Page

384 / 388

Related Subject Headings

  • General Physics
  • 4019 Resources engineering and extractive metallurgy
  • 0915 Interdisciplinary Engineering
  • 0203 Classical Physics
 

Citation

APA
Chicago
ICMJE
MLA
NLM
Renard, B., Dispau, G., Donati, A., Genini, L., Gournay, J. F., Kuster, O., … Walter, C. (2011). Ten years of cryomagnetic W7-X test facility construction and operation. Cryogenics, 51(7), 384–388. https://doi.org/10.1016/j.cryogenics.2011.03.005
Renard, B., G. Dispau, A. Donati, L. Genini, J. F. Gournay, O. Kuster, F. Molinié, et al. “Ten years of cryomagnetic W7-X test facility construction and operation.” Cryogenics 51, no. 7 (July 1, 2011): 384–88. https://doi.org/10.1016/j.cryogenics.2011.03.005.
Renard B, Dispau G, Donati A, Genini L, Gournay JF, Kuster O, et al. Ten years of cryomagnetic W7-X test facility construction and operation. Cryogenics. 2011 Jul 1;51(7):384–8.
Renard, B., et al. “Ten years of cryomagnetic W7-X test facility construction and operation.” Cryogenics, vol. 51, no. 7, July 2011, pp. 384–88. Scopus, doi:10.1016/j.cryogenics.2011.03.005.
Renard B, Dispau G, Donati A, Genini L, Gournay JF, Kuster O, Molinié F, Schild T, Touzery R, Vieillard L, Walter C. Ten years of cryomagnetic W7-X test facility construction and operation. Cryogenics. 2011 Jul 1;51(7):384–388.
Journal cover image

Published In

Cryogenics

DOI

ISSN

0011-2275

Publication Date

July 1, 2011

Volume

51

Issue

7

Start / End Page

384 / 388

Related Subject Headings

  • General Physics
  • 4019 Resources engineering and extractive metallurgy
  • 0915 Interdisciplinary Engineering
  • 0203 Classical Physics