Commissioning of the new RF system with the HOM damped RF cavity
Publication
, Journal Article
Arbuzov, VS; Bushuev, A; Gavrilov, N; Gorniker, EI; Kenjebulatov, E; Kholopov, MA; Kondakov, AA; Krutikhin, SA; Kruchkov, YG; Kuptsov, IV ...
Published in: Proceedings of the IEEE Particle Accelerator Conference
December 1, 2005
A new 178 MHz RF system has been commissioned at Duke Storage Ring. It consists of a 140 kW tetrode transmitter; higher order modes (HOM) damped RF cavity and the necessary frequency and voltage control electronics. The cavity walls are made of copper-on-stainless steel bimetal (8 mm Cu, 7 mm SS). The cavity has a larger beam pipe opening (700 mm in diameter) in the down-stream side, which allows the HOM propagating out of the cavity and being absorbed by the ceramic loads. The design details and the commissioning results are presented in this paper. © 2005 IEEE.
Duke Scholars
Published In
Proceedings of the IEEE Particle Accelerator Conference
DOI
Publication Date
December 1, 2005
Volume
2005
Start / End Page
1555 / 1556
Citation
APA
Chicago
ICMJE
MLA
NLM
Arbuzov, V. S., Bushuev, A., Gavrilov, N., Gorniker, E. I., Kenjebulatov, E., Kholopov, M. A., … Wu, Y. K. (2005). Commissioning of the new RF system with the HOM damped RF cavity. Proceedings of the IEEE Particle Accelerator Conference, 2005, 1555–1556. https://doi.org/10.1109/PAC.2005.1590833
Arbuzov, V. S., A. Bushuev, N. Gavrilov, E. I. Gorniker, E. Kenjebulatov, M. A. Kholopov, A. A. Kondakov, et al. “Commissioning of the new RF system with the HOM damped RF cavity.” Proceedings of the IEEE Particle Accelerator Conference 2005 (December 1, 2005): 1555–56. https://doi.org/10.1109/PAC.2005.1590833.
Arbuzov VS, Bushuev A, Gavrilov N, Gorniker EI, Kenjebulatov E, Kholopov MA, et al. Commissioning of the new RF system with the HOM damped RF cavity. Proceedings of the IEEE Particle Accelerator Conference. 2005 Dec 1;2005:1555–6.
Arbuzov, V. S., et al. “Commissioning of the new RF system with the HOM damped RF cavity.” Proceedings of the IEEE Particle Accelerator Conference, vol. 2005, Dec. 2005, pp. 1555–56. Scopus, doi:10.1109/PAC.2005.1590833.
Arbuzov VS, Bushuev A, Gavrilov N, Gorniker EI, Kenjebulatov E, Kholopov MA, Kondakov AA, Krutikhin SA, Kruchkov YG, Kuptsov IV, Kurkin GY, Mironenko LA, Mityanina N, Motygin SV, Osipov VN, Petrov V, Pilan AM, Popov AM, Rotov E, Sedlyarov I, Tribendis AG, Volkov V, Wang P, Mikhailov S, Wallace PW, Wu YK. Commissioning of the new RF system with the HOM damped RF cavity. Proceedings of the IEEE Particle Accelerator Conference. 2005 Dec 1;2005:1555–1556.
Published In
Proceedings of the IEEE Particle Accelerator Conference
DOI
Publication Date
December 1, 2005
Volume
2005
Start / End Page
1555 / 1556