Skip to main content

Vault settlement prediction for a metro cross passage based on time series

Publication ,  Journal Article
Wang, T; Wang, C; Yao, A; Wu, Q; Zhang, H; Wang, Z
Published in: Modern Tunnelling Technology
June 1, 2016

For a station on Changchun Metro Line 1, it is necessary to monitor the deformation of a cross passage during construction by the CRD method. Considering that the erection of air ducts may impede settlement monitoring, prediction of the vault settlement for a typical section becomes even more important. Therefore, an ARMA model based on time series was set up based on data preprocessing for the ingate vault settlement and the truncated characteristics of its autocorrelation function and partial autocorrelation function. Values of relevant parameters were primarily determined based on the recursion formula of the autocovariance function and the spectral density function of the MA model, and further optimization was carried out for these parameters utilizing a Newton iterative algorithm. A model was established based on the settlements of the first 100 days after cross passage excavation and was used for predicting the settlements of the next 10 days. Finally, a comparison was carried out between the results from a regression prediction and the ones from field monitoring in order to verify the feasibility of this model. The results show that the errors of the first five days' prediction results are smaller than that of the regression prediction, and they tend to be consistent with each other with the passing of time, proving the advantages of time series for shortterm prediction.

Duke Scholars

Published In

Modern Tunnelling Technology

DOI

ISSN

1009-6582

Publication Date

June 1, 2016

Volume

53

Issue

3

Start / End Page

74 / 81
 

Citation

APA
Chicago
ICMJE
MLA
NLM
Wang, T., Wang, C., Yao, A., Wu, Q., Zhang, H., & Wang, Z. (2016). Vault settlement prediction for a metro cross passage based on time series. Modern Tunnelling Technology, 53(3), 74–81. https://doi.org/10.13807/j.cnki.mtt.2016.03.011
Wang, T., C. Wang, A. Yao, Q. Wu, H. Zhang, and Z. Wang. “Vault settlement prediction for a metro cross passage based on time series.” Modern Tunnelling Technology 53, no. 3 (June 1, 2016): 74–81. https://doi.org/10.13807/j.cnki.mtt.2016.03.011.
Wang T, Wang C, Yao A, Wu Q, Zhang H, Wang Z. Vault settlement prediction for a metro cross passage based on time series. Modern Tunnelling Technology. 2016 Jun 1;53(3):74–81.
Wang, T., et al. “Vault settlement prediction for a metro cross passage based on time series.” Modern Tunnelling Technology, vol. 53, no. 3, June 2016, pp. 74–81. Scopus, doi:10.13807/j.cnki.mtt.2016.03.011.
Wang T, Wang C, Yao A, Wu Q, Zhang H, Wang Z. Vault settlement prediction for a metro cross passage based on time series. Modern Tunnelling Technology. 2016 Jun 1;53(3):74–81.

Published In

Modern Tunnelling Technology

DOI

ISSN

1009-6582

Publication Date

June 1, 2016

Volume

53

Issue

3

Start / End Page

74 / 81