Inventory policies in a decentralized assembly system

Publication ,  Journal Article
Bernstein, F; Decroix, GA
Published in: Operations Research
March 1, 2006

We consider a system in which a single finished good is assembled from two components. Demand for the finished product is stochastic and stationary, and procurement and assembly lead times are constant. Unsatisfied demand is backordered. The inventory of each component or assembly is controlled by a separate firm using a base-stock policy. Each firm is charged holding costs on its own inventory, plus a share of the shortage cost due to backorders of the finished product. We investigate the equilibrium base-stock levels that arise in this system under both echelon and local base-stock policies. In both cases, the component firms' base-stock levels are economic complements. We then examine the effect on system performance when one firm uses information about other firms' pipeline inventory. We find that, under echelon base-stock policies, all firms benefit with the use of pipeline information. In contrast, under local policies, using pipeline information may actually increase costs for some firms (including the firm that makes direct use of the information). Also, we compare the behavior of the decentralized system with that of the assembly system under centralized control. Finally, we describe a payment scheme between the final assembler and the suppliers that allows the decentralized system to achieve the centralized solution. © 2006 INFORMS.

Duke Scholars

Published In

Operations Research

DOI

EISSN

1526-5463

ISSN

0030-364X

Publication Date

March 1, 2006

Volume

54

Issue

2

Start / End Page

324 / 336

Related Subject Headings

  • Operations Research
  • 3507 Strategy, management and organisational behaviour
  • 1503 Business and Management
  • 0802 Computation Theory and Mathematics
  • 0102 Applied Mathematics
 

Citation

APA
Chicago
ICMJE
MLA
NLM
Bernstein, F., & Decroix, G. A. (2006). Inventory policies in a decentralized assembly system. Operations Research, 54(2), 324–336. https://doi.org/10.1287/opre.1050.0256
Bernstein, F., and G. A. Decroix. “Inventory policies in a decentralized assembly system.” Operations Research 54, no. 2 (March 1, 2006): 324–36. https://doi.org/10.1287/opre.1050.0256.
Bernstein F, Decroix GA. Inventory policies in a decentralized assembly system. Operations Research. 2006 Mar 1;54(2):324–36.
Bernstein, F., and G. A. Decroix. “Inventory policies in a decentralized assembly system.” Operations Research, vol. 54, no. 2, Mar. 2006, pp. 324–36. Scopus, doi:10.1287/opre.1050.0256.
Bernstein F, Decroix GA. Inventory policies in a decentralized assembly system. Operations Research. 2006 Mar 1;54(2):324–336.

Published In

Operations Research

DOI

EISSN

1526-5463

ISSN

0030-364X

Publication Date

March 1, 2006

Volume

54

Issue

2

Start / End Page

324 / 336

Related Subject Headings

  • Operations Research
  • 3507 Strategy, management and organisational behaviour
  • 1503 Business and Management
  • 0802 Computation Theory and Mathematics
  • 0102 Applied Mathematics