Skip to main content
Journal cover image

Flood coincidence analysis of Poyang Lake and Yangtze River: risk and influencing factors

Journal articles  - Review
Jianping, B; Pengxin, D; Xiang, Z; Sunyun, L; Marani, M; Yi, X
Published in: Stochastic Environmental Research and Risk Assessment
April 1, 2018

We build copula function-based joint distribution models for the annual maximum flood peaks of the Yangtze River and Poyang Lake, to analyze the coincidence probabilities, using scenarios that combine with the impoundment of three Gorges, define influencing indexes and relative contribution rates on flood coincidence at varying frequencies. The study shows the probabilities for coincidence of floods with 1000, 100, and 10-year return periods in both Yangtze main stem and Poyang Lake are respectively 0.02, 0.19 and 2.87%, with higher coincidence probabilities for shorter return periods; when 1000-year flood occurs in the Yangtze, the probabilities for Poyang Lake to encounter flood of the 1000, 100, or 10-year magnitude are higher than 16.08, 42.48 or 74.77% respectively; Poyang–Yangtze flood coincidence is affected by operation of the hydraulic engineering. The lowering of flood peaks caused by the Three Gorges impoundment and regulation of the lake have respectively reduced the probabilities of Poyang–Yangtze flood coincidence by about 7.0 and 1.97%, with average relative contribution rates − 33.82 and − 17.1%; influenced by hydrological projects in Poyang basin, variations in Poyang’s inflow flood have displayed an average contribution rate of 20.4% for the negative effect on extreme (P OpenSPiltSPi 5% or P CloseSPigtSPi 90%) flood coincidence, while having a positive contribution rate of 38.2% on floods of other return periods. The results can help increase our understanding of flood coincidence, and support flood control efforts in Poyang Lake; its analytical approach may also be useful to other applications of copula functions.

Duke Scholars

Altmetric Attention Stats
Dimensions Citation Stats

Published In

Stochastic Environmental Research and Risk Assessment

DOI

EISSN

1436-3259

ISSN

1436-3240

Publication Date

April 1, 2018

Volume

32

Issue

4

Start / End Page

879 / 891

Related Subject Headings

  • Strategic, Defence & Security Studies
  • 49 Mathematical sciences
  • 40 Engineering
 

Citation

APA
Chicago
ICMJE
MLA
NLM
Jianping, B., Pengxin, D., Xiang, Z., Sunyun, L., Marani, M., & Yi, X. (2018). Flood coincidence analysis of Poyang Lake and Yangtze River: risk and influencing factors. Stochastic Environmental Research and Risk Assessment, 32(4), 879–891. https://doi.org/10.1007/s00477-018-1514-4
Jianping, B., D. Pengxin, Z. Xiang, L. Sunyun, M. Marani, and X. Yi. “Flood coincidence analysis of Poyang Lake and Yangtze River: risk and influencing factors.” Stochastic Environmental Research and Risk Assessment 32, no. 4 (April 1, 2018): 879–91. https://doi.org/10.1007/s00477-018-1514-4.
Jianping B, Pengxin D, Xiang Z, Sunyun L, Marani M, Yi X. Flood coincidence analysis of Poyang Lake and Yangtze River: risk and influencing factors. Stochastic Environmental Research and Risk Assessment. 2018 Apr 1;32(4):879–91.
Jianping, B., et al. “Flood coincidence analysis of Poyang Lake and Yangtze River: risk and influencing factors.” Stochastic Environmental Research and Risk Assessment, vol. 32, no. 4, Apr. 2018, pp. 879–91. Scopus, doi:10.1007/s00477-018-1514-4.
Jianping B, Pengxin D, Xiang Z, Sunyun L, Marani M, Yi X. Flood coincidence analysis of Poyang Lake and Yangtze River: risk and influencing factors. Stochastic Environmental Research and Risk Assessment. 2018 Apr 1;32(4):879–891.
Journal cover image

Published In

Stochastic Environmental Research and Risk Assessment

DOI

EISSN

1436-3259

ISSN

1436-3240

Publication Date

April 1, 2018

Volume

32

Issue

4

Start / End Page

879 / 891

Related Subject Headings

  • Strategic, Defence & Security Studies
  • 49 Mathematical sciences
  • 40 Engineering