With the deepening reform of electric power system in China, the commonly used security constrained economic dispatching model cannot meet the calculation period requirement of open and impartial dispatching, and in order to overcome the influence of electric power direct trading on open and impartial dispatching, a two-stage optimization model for annual rolling generation scheduling with the consideration of open and impartial dispatching is proposed. In the first stage, the optimal rolling unit commitment model considering the direct trading and open and impartial dispatching is built, which optimizes unit commitment and power generation schedule in the annual residual period. In the second stage, the generation scheduling optimization model considering the balance of daily load rate of power plant is built to avoid the rapid change of average daily load rate. The simulative results of a practical provincial power grid verify the correctness of the proposed model and the effectiveness of the proposed method.

Duke Scholars

Published In

Dianli Zidonghua Shebei/Electric Power Automation Equipment

DOI

ISSN

1006-6047

Publication Date

December 10, 2018

Volume

38

Issue

12

Start / End Page

155 / 161

Related Subject Headings

  • Energy
 

Citation

APA
Chicago
ICMJE
MLA
NLM
Xie, B., Yang, X., Yu, Z., Luo, G., & Guo, R. (2018). Two-stage optimization model for annual rolling generation scheduling considering open and impartial dispatching. Dianli Zidonghua Shebei/Electric Power Automation Equipment, 38(12), 155–161. https://doi.org/10.16081/j.issn.1006-6047.2018.12.023
Xie, B., X. Yang, Z. Yu, G. Luo, and R. Guo. “Two-stage optimization model for annual rolling generation scheduling considering open and impartial dispatching.” Dianli Zidonghua Shebei/Electric Power Automation Equipment 38, no. 12 (December 10, 2018): 155–61. https://doi.org/10.16081/j.issn.1006-6047.2018.12.023.
Xie B, Yang X, Yu Z, Luo G, Guo R. Two-stage optimization model for annual rolling generation scheduling considering open and impartial dispatching. Dianli Zidonghua Shebei/Electric Power Automation Equipment. 2018 Dec 10;38(12):155–61.
Xie, B., et al. “Two-stage optimization model for annual rolling generation scheduling considering open and impartial dispatching.” Dianli Zidonghua Shebei/Electric Power Automation Equipment, vol. 38, no. 12, Dec. 2018, pp. 155–61. Scopus, doi:10.16081/j.issn.1006-6047.2018.12.023.
Xie B, Yang X, Yu Z, Luo G, Guo R. Two-stage optimization model for annual rolling generation scheduling considering open and impartial dispatching. Dianli Zidonghua Shebei/Electric Power Automation Equipment. 2018 Dec 10;38(12):155–161.

Published In

Dianli Zidonghua Shebei/Electric Power Automation Equipment

DOI

ISSN

1006-6047

Publication Date

December 10, 2018

Volume

38

Issue

12

Start / End Page

155 / 161